CHAS accredited · Constructionline · CDM 2015 0161 503 4968enquiries@walkercsl.com
Discuss a project
Pleasington Priory — West End

CompletedPleasington, Lancashire

Pleasington Priory — West End

Rebuilding the west front's parapets, and giving its balconies a proper route to shed water.

Scope of works

  1. Stone parapets dismantled and rebuilt, with new lead gutters to the balconies
  2. The full elevation raked out and repointed in hydraulic lime mortar
  3. Offsets to the turrets capped in lead, and the lower roof re-roofed in Burlington slate
  4. Buttresses core-drilled for lead pipes into new lead hoppers and cast iron downpipes, discharging to new soakaways
  5. Glazing repairs to the rose window by specialist subcontractors
  6. Internal plaster removed so that the walls could dry out

Photographs from site

6 plates · tap to enlarge

Adrian and his dedicated team have addressed all our repairs, going above and beyond their remit.

Fr Shaun K. BraidenParish Priest, Pleasington Priory

Out to tender?

Put a time-served team on your select list.

Architects, surveyors, dioceses and trusts: send us the package, or ring Adrian or Marcus to talk through the building first.

Concept design · not the official website