
ArchiveAdlington, Cheshire
Adlington Hall — Mews
Structural repairs to the Mews balconies, with the ironwork needle-gunned to bare metal and protected in a five-coat epoxy system.
Scope of works
- The existing timber decks removed
- Ironwork needle-gunned back to bare metal, then primed
- Structural steel replaced
- Repainted in a five-coat epoxy paint system


