CHAS accredited · Constructionline · CDM 2015 0161 503 4968enquiries@walkercsl.com
Discuss a project
Adlington Hall — Mews

ArchiveAdlington, Cheshire

Adlington Hall — Mews

Structural repairs to the Mews balconies, with the ironwork needle-gunned to bare metal and protected in a five-coat epoxy system.

Scope of works

  1. The existing timber decks removed
  2. Ironwork needle-gunned back to bare metal, then primed
  3. Structural steel replaced
  4. Repainted in a five-coat epoxy paint system

Photographs from site

8 plates · tap to enlarge

Out to tender?

Put a time-served team on your select list.

Architects, surveyors, dioceses and trusts: send us the package, or ring Adrian or Marcus to talk through the building first.

Concept design · not the official website