Capesthorne Hall — Theatre Wing

The theatre wing given the same treatment: four stone chimneys rebuilt, then the roofs stripped, repaired and re-slated.

Scope of works

  1. Scaffold and a temporary roof erected over the theatre wing
  2. Four large stone chimneys dismantled, repaired and rebuilt
  3. Slate and lead roofs stripped, with repairs to the structural timbers
  4. New gutter bottoms formed, and lead gutters and valleys reformed
  5. Roofs re-slated

Photographs from site