CHAS accredited · Constructionline · CDM 2015 0161 503 4968enquiries@walkercsl.com
Discuss a project
Adlington Hall — Great Hall

ArchiveAdlington, Cheshire

Adlington Hall — Great Hall

Lifting and relaying the Great Hall's stone slate roof, with new Code 8 lead gutters beneath.

Scope of works

  1. Scaffold and a temporary roof erected over the Great Hall
  2. Stone slates removed and the existing lead-lined timber gutters taken up
  3. Repairs to structural timbers, with new timber gutters formed to correct falls and covered in Code 8 lead
  4. The roof slopes re-slated using the existing stone slates
  5. Brick replacement and repointing to the chimney stacks in hydraulic lime mortar

Photographs from site

14 plates · tap to enlarge

Out to tender?

Put a time-served team on your select list.

Architects, surveyors, dioceses and trusts: send us the package, or ring Adrian or Marcus to talk through the building first.

Concept design · not the official website